| Strengthening & Improvement of Kampala ‐ Entebbe Road | 4,9km Road, Stone base and 50mm of Asphalt wearing course | ||
| 4,9km Road, Stone base and 50mm of Asphalt wearing course soweto Road | 2000‐2001 | Clearing and grubbing, excavation, stone base and asphalt wearing corse | Download |
| Mpologamo (Budumba) Railway bridge conversion. | 2001‐2002 | Conversion of a 100m long railway bridge into road and rail | |
| Kabale ‐ Katuna road | 2001‐2002 | 22km road, gravel subbase‐base and single surface dressing. | |
| Up‐grading of Kampala ‐ Gayaza road | 2001-2014 | 19,5 km road to bitumen standard | |
| Supply of New Stone Ballast | 2005 | 30.000 m3, repairs to Kampala ‐ Malaba Railway Line. | |
| Construction of Kampala Northern Bypass, Salini (Stirling‐Spencon JV) | 2004‐2007 | 21 km road to bitumen standard with five grade intersections and 3.5 km dual carriageway. | |
| CHOGM 2007 Infrastructure Projects Package 2 Lot 1 | 2007 | Rehabilitation of various road in Kampalat to bitumen standard | |
| Backlog Roads Maintenance Programme (BRMP) Package 5 | 2008‐2010 | 60 km road: 12km Mechanical modification and double surface dressing full width 9m 48km shoulder gravelling with single seal | |
| Backlog Roads Maintenance Programme (BRMP) Package 6 | 2008‐2011 | 96 km road: Sholder gravelling, Potholes repair & Drainage clearing | |
| Reconstruction and Rehabilitation of Busega ‐ Muduuma Road. Lot 1 | 2009‐2011 | 27 km Road: Spot Repairs and Resealing of Busega‐Mityana | |
| Staged Reconstruction of Mukono – Jinja Road Project | 2011‐2015 | Milling to even existing asphalt, patching potholes and sealing cracks, overlaying with new asphalt wearing course on carriageway and reconstruction of shoulders with gravel finished with double surface dressing or removing of existing base with crr to form sub base layer. | Download |
| Emergency repairs of Jinja‐Iganga Kibimba road | 2010‐2012 | 91 km road, gravel subbase‐base, double seal surface dressing. | |
| Civil works for Rehabilitation of Kireka – Kyaliwajjala -Namugongo- Road 8.0Km | 2012‐2015 | Milling to even existing asphalt, patching potholes and sealing cracks, overlaying with new asphalt wearing course on carriageway | Download |
| Upgrading of Namanve Industrial Park Access Roads (4km) | 2013‐2016 | Site Clearance and removal of topsoil, road bed preparation, earthworks for the new alignment inclusive of the formation of all drains, side ditches, junctions and minor access roads, construction of pavement layers consisting of improved sub grade, mechanically stabilised works mc-30, track coat and asphalt wearing course works, concrete, drainage works, 900mm and 600mm diameter culvert works, concrete for head walls and culvert | Download |
| Reconstruction of Kafumbe- Mukasa Road (0.65km) and Kisenyi Road (0.73km) | 2014‐2016 | The works consist of; construction of 0.73km of Kisenyi Road, relocation of existing utility services, removal of unstable material including industrial and natural debris, reprocessing of the existing road pavement structure to form the reconstructed road sub grade, preparation of the formation for the foot ways, removal of the existing pre cast concrete kerbing (including bed and backing) and disposal to spoil, provision and laying of 600mm and 900 mm diameter | Download |
| Upgrading of Gravel Roads to Bitumen Standard Phase 11-Lot 1 Kimera Road | 2014‐2016 | The upgrading from gravel road to bituminous surfaces road standard of Kimera road (0.9km) along with access roads junctions., drainage works comprising of the installation of a triple 1200mm dia precast concrete cross culvert (together with its end structures), installation of 600mm dia precast concrete pipe culvert side drains under the raised sidewalks, including inspections manholes, cleaning up the site to remove any contamination of the works following the termination of the previous works contract, scrapping off contaminated crushed stone subbase / base material and disposing it off, re-working of the existing pavement layers | |
| Reconstruction and Rehabilitation of Busega ‐ Muduuma Road. Lot 1 | 2009‐2011 | 27 km Road: Spot Repairs and Resealing of Busega‐Mityana | Download |
| Reconstruction of Kalinda , Kabakanjagala and Sekabaka Kintu Roads in Lubaga Division; | 22015-2016 | Excavating and milling of material from an existing pavement, scarifying and re compacting of existing pavement layers, providing , laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) 100mm thick and existing pavement base course 100mm thick to make 200mm thick base course, prepare base course, provide heat and spray MC-70 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3 | Download |
| Construction of roads in North Estates at Kampala Industrial and Business park – Design and Build contract Uganda | 2016- 2017 | 2Scarifying and re compacting of existing pavement layers, providing, cutting to spoil and filling to selected road sections, laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) and selected natural gravel material to form subbase, 150mm thick crushed stone class CRR base layer, provide heat and spray MC-30 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3, Asphalt concrete surfacing, excavation for open drains | Download |
| Construction of roads in North Estates at Kampala Industrial and Business park – Design and Build contract Uganda | 2016- 2017 | 2Scarifying and re compacting of existing pavement layers, providing, cutting to spoil and filling to selected road sections, laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) and selected natural gravel material to form subbase, 150mm thick crushed stone class CRR base layer, provide heat and spray MC-30 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3, Asphalt concrete surfacing, excavation for open drains | Download |
| The rehabilitation of selected national roads (6 Lots) – Uganda Lot 3: Iganga – Kaliro Road (32Km) -Uganda | 2014-2018 | The works include; breaking up existing pavement layers, mechanically stabilised sub base and shoulders, crushed stone class CRR for base, prime coat to the base and shoulder sections using cut- back bitumen, first and second seal coat to the repaired sections using bitumen 80/100, 20mm and 10mm chippings, drainage works, shoulder works and cleaning/ re-excavating side drains and other related drainage works. | |
| Framework contract for the supply of road surfacing hot mixed asphalt stones, quarry products and provision of road asphalt paving plant Uganda | 2015 - 2019 | 2Scarifying and re compacting of existing pavement layers, providing, cutting to spoil and filling to selected road sections, laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) and selected natural gravel material to form subbase, 150mm thick crushed stone class CRR base layer, provide heat and spray MC-30 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3, Asphalt concrete surfacing, excavation for open drains | |
| Construction of roads in North Estates at Kampala Industrial and Business park – Design and Build contract Uganda | 2016- 2017 | 2Scarifying and re compacting of existing pavement layers, providing, cutting to spoil and filling to selected road sections, laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) and selected natural gravel material to form subbase, 150mm thick crushed stone class CRR base layer, provide heat and spray MC-30 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3, Asphalt concrete surfacing, excavation for open drains | Download |
| Uganda Christain University(UCU)construction of 3km road project of the first phase include Suubi, Sanyu, Library Rise, Alpha Roads, ascent to Agape road, access to Junction, and Football Field access | 2017 - 2019 | The works include; Pothole patching and edge repairs, construction of road humps and rumble strips including application of approved aggregates blinding material, Asphalt concrete surfacing as per specified thickness | Download |
| LOT 4-Design update and construction of roads in the City | 2017- 2019 | Reconstruction and/or Upgrading of Magambo-0.9km, Dembe-Kilowoza-3.0km, Kiziri-0.75km, Kigoowa-1.9km, Kimera-1.4km, Kisalita-0.7km, Kisosonkole-1.0km, and Robert Mugabe-1.8km | |
| LOT 1-Design update and construction of roads in the City; | 2017- 2020 | Reconstruction and/or Upgrading of NMT pilot corridor; Namirembe-Luwuum-1.5km, Archer-0.75km, Mengo hill-0.75km, Nakivubo channel-0.5km, Mpabaana-0.75km, Luzige-0.3km , Mutebi-0.45km, and Semugooma-0.4km | |
| Bukasa Port Project - Design and Build of Start Up Infrastructure:Access/Construction Roads and Security Fencing | 2019- UPTODATE | 2Scarifying and re compacting of existing pavement layers, providing, cutting to spoil and filling to selected road sections, laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) and selected natural gravel material to form subbase, 150mm thick crushed stone class CRR base layer, provide heat and spray MC-30 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3, Asphalt concrete surfacing, excavation for open drains | |
| Second Kampala Institutional and infrastructure development programme(KIIDP-2) | 2019- UPTODATE | Recycling and overlay of Lukuli Road (7.71KM(including signalization of Lukuli/Namasoole.Kayemba Junction) | |
| Ministry of Lands,Housing with Uganda Support to Municipal infrastructure Development(USMID-AF)Programme | 2020- UPTODATE | Rehabilitation of Main street(0.3Km),Busoga Road(0.35Km) and Eng Zikusooka way(1.9Km) | |
| Frame Work Contract | 2020- UPTODATE | Reconstruction of Old Taxi Park |