• +256-414504941
  • stirling@africanonline.co.ug
  • :www.stirlingcivileng.com
  • :Plot 3-5 Buvuma Road Port Bell Road P.O.BOX :796 Kamapla Uganda






WELCOME TO LAST 10 YEARS PROJECTS

 

Project title Period Description Of Works Certificate of Completion
Strengthening & Improvement of Kampala ‐ Entebbe Road 2000‐2001 4,9km Road, Stone base and 50mm of Asphalt wearing course
4,9km Road, Stone base and 50mm of Asphalt wearing course 2000‐2001 Clearing and grubbing, excavation, stone base and asphalt wearing corse Download
Mpologamo (Budumba) Railway bridge conversion. 2001‐2002 Conversion of a 100m long railway bridge into road and rail
Kabale ‐ Katuna road 2001‐2002 22km road, gravel subbase‐base and single surface dressing.
Up‐grading of Kampala ‐ Gayaza road 2001-2014 19,5 km road to bitumen standard
Supply of New Stone Ballast 2005 30.000 m3, repairs to Kampala ‐ Malaba Railway Line.
Construction of Kampala Northern Bypass, Salini (Stirling‐Spencon JV) 2004‐2007 21 km road to bitumen standard with five grade intersections and 3.5 km dual carriageway.
CHOGM 2007 Infrastructure Projects Package 2 Lot 1 2007 Rehabilitation of various road in Kampalat to bitumen standard
Backlog Roads Maintenance Programme (BRMP) Package 5 2008‐2010 60 km road: 12km Mechanical modification and double surface dressing full width 9m 48km shoulder gravelling with single seal
Backlog Roads Maintenance Programme (BRMP) Package 6 2008‐2011 96 km road: Sholder gravelling, Potholes repair & Drainage clearing
Reconstruction and Rehabilitation of Busega ‐ Muduuma Road. Lot 1 2009‐2011 27 km Road: Spot Repairs and Resealing of Busega‐Mityana
Staged Reconstruction of Mukono – Jinja Road Project 2011‐2015 Milling to even existing asphalt, patching potholes and sealing cracks, overlaying with new asphalt wearing course on carriageway and reconstruction of shoulders with gravel finished with double surface dressing or removing of existing base with crr to form sub base layer. Download
Emergency repairs of Jinja‐Iganga Kibimba road 2010‐2012 91 km road, gravel subbase‐base, double seal surface dressing.
Civil works for Rehabilitation of Kireka – Kyaliwajjala -Namugongo- Road 8.0Km 2012‐2015 Milling to even existing asphalt, patching potholes and sealing cracks, overlaying with new asphalt wearing course on carriageway and Download
Upgrading of Namanve Industrial Park Access Roads (4km) 2013‐2016 Site Clearance and removal of topsoil, road bed preparation, earthworks for the new alignment inclusive of the formation of all drains, side ditches, junctions and minor access roads, construction of pavement layers consisting of improved sub grade, mechanically stabilised works mc-30, track coat and asphalt wearing course works, concrete, drainage works, 900mm and 600mm diameter culvert works, concrete for head walls and culvert Download
Reconstruction of Kafumbe- Mukasa Road (0.65km) and Kisenyi Road (0.73km) 2014‐2016 The works consist of; construction of 0.73km of Kisenyi Road, relocation of existing utility services, removal of unstable material including industrial and natural debris, reprocessing of the existing road pavement structure to form the reconstructed road sub grade, preparation of the formation for the foot ways, removal of the existing pre cast concrete kerbing (including bed and backing) and disposal to spoil, provision and laying of 600mm and 900 mm diameter Download
Upgrading of Gravel Roads to Bitumen Standard Phase 11-Lot 1 Kimera Road 2014‐2016 The upgrading from gravel road to bituminous surfaces road standard of Kimera road (0.9km) along with access roads junctions., drainage works comprising of the installation of a triple 1200mm dia precast concrete cross culvert (together with its end structures), installation of 600mm dia precast concrete pipe culvert side drains under the raised sidewalks, including inspections manholes, cleaning up the site to remove any contamination of the works following the termination of the previous works contract, scrapping off contaminated crushed stone subbase / base material and disposing it off, re-working of the existing pavement layers Download
Reconstruction of Kalinda , Kabakanjagala and Sekabaka Kintu Roads in Lubaga Division; 2015-2016 Excavating and milling of material from an existing pavement, scarifying and re compacting of existing pavement layers, providing , laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) 100mm thick and existing pavement base course 100mm thick to make 200mm thick base course, prepare base course, provide heat and spray MC-70 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3 Download
Construction of roads in North Estates at Kampala Industrial and Business park – Design and Build contract Uganda 2016- 2017 Scarifying and re compacting of existing pavement layers, providing, cutting to spoil and filling to selected road sections, laying and constructing a combined mechanically stabilised layer constituting of approved crushed aggregate class CRS (coarse type) and selected natural gravel material to form subbase, 150mm thick crushed stone class CRR base layer, provide heat and spray MC-30 cutback bitumen (1.0 litre/sq.) including application of approved aggregates blinding material at rate of 200m2/m3, Asphalt concrete surfacing, excavation for open drains Download
The rehabilitation of selected national roads (6 Lots) – Uganda Lot 3: Iganga – Kaliro Road (32Km) -Uganda 2014-UP TO DATE The works include; breaking up existing pavement layers, mechanically stabilised sub base and shoulders, crushed stone class CRR for base, prime coat to the base and shoulder sections using cut- back bitumen, first and second seal coat to the repaired sections using bitumen 80/100, 20mm and 10mm chippings, drainage works, shoulder works and cleaning/ re-excavating side drains and other related drainage works.
Framework contract for the supply of road surfacing hot mixed asphalt stones, quarry products and provision of road asphalt paving plant Uganda 2015 - UP TO DATE The works include; Pothole patching and edge repairs, construction of road humps and rumble strips, spraying MC-30 cutback bitumen (1.0 litre/sq.m) including application of approved aggregates blinding material, Asphalt concrete surfacing as per specified thickness
Uganda Christain University(UCU) 3km Road construction Project 2017 - UP TO DATE Uganda Christain University(UCU)construction of 3km road project of the first phase include Suubi, Sanyu, Library Rise, Alpha Roads, ascent to Agape road, access to Junction, and Football Field access